The situational plan
Development of transport infrastructure of Taman sea port
   
   
 
   
   
   
   
   
   





  To home Map of resource Feedback



Strategy of development of water transport of Krasnodar area
Location and brief characteristics of the construction area
Requirement for the land resources of the new commercial sea port
  Complexes of the first, second and third stage of construction
the first stage of construction
the second stage of construction
the third stage of construction
Organization of the secure boundary-customs area
Transport service
Guarantee for employees and their families the objects of the housing and public utilities and social-welfare designation
Architectural design
Heating
Communication and signaling system
Possible influence on the environmental situation of the port complexes
Common arrangements of measures for warning of emergency situations
Financial and economic appraisal of efficiency of investment
Conclusion



Complex of the second stage of construction

The second stage of construction of port complexes in the area of Tuzla dam will include:
The second area (the second stage of construction) Tuzla dam:
- A complex on the transshipment of metal - 2 million t/year;
- complex on the transshipment of mineral fertilizers - 3 mln. t/yr
- complex on the transshipment of forest - 3 mln. t/yr. Sanitary cutting down of Kuban oak and beech.

The basic characteristics of the mooring front of the second stage of construction are given in Table 10.

Table 10.

№ п/п Title of the construction Length, м Mark of bottom, м
1 Complex on the forest transshipment
1.1 waterfront for vessels SL-5 1550 -9,6
2 Complex on the forest transshipment and its processing
2.1 waterfront for vessels SL-5 660 -9,6
3 Complex on the metal transshipment
3.1 waterfront for vessels SN-40 775 -14,1
4 Complex on the transshipment of mineral fertilizers
4.1 waterfront for vessels SN -50 350 -14,1

The requirement for the land resources of the objects of the second stage of construction is given in Table 11.

Table 11.

Title of works Unit of measurment Quantity Nota bene
1 Square of formable territory, total ga 165,3  
  including: ga    
  Complex on the forest transshipment ga 60,0 Newly formed territory
  Complex on the forest transshipment and its processing ga 18,0 Newly formed territory – 8,4 ga
On the territory – 9,6 ga
  Complex on the metal transshipment ga 47,0 Newly formed territory
  Complex on the transshipment of mineral fertilizers ga 40,3 Newly formed territory

Port complex in the area of Tuzla dam is destined for the transshipment of general (metals) and forest cargo, and also mineral fertilizers.
The operating regime of complexes is year-round, twenty-four hour. The maximum design vessel in the area of Tuzla dam with dead weight from 20 thousand Vol. (11 stage) to 50 thousand Vol. (21 stage).
Delivery and pickup of cargo will be both by railroad: metal and forest cargo in the open box cars and on the platforms, other cargo in the open box cars and the covered trucks, and by motor transport.
Besides, it is examined the possibility of delivery to the complexes by vessels of the "river- sea" type of the parts of the forest and metal cargo for further shipping for export. The distribution of the turn-over in the directions of transportation is represented in Table 12.

Table 12.

Title of cargo Unit of measurment Total Including:
delivery pickup
General cargo (metals) Mln.t 2,00 - 2,00
Forest cargo Mln.t 3,00 - 3,00
mineral fertilizers Mln.t 3,00 - 3,00
Forest cargo Mln.t 1,5 1,5 -
Metals Mln.t 0,5 0,5 -

There will be reception for shipping of vessels on the above mentioned complexes with dead weight from 4,5 to 50 thousand t, that caused by the sizes of cargo parties.
The basic characteristics of maximum design vessels are represented in Table 13.

Table 13.

Title of complex Type of ship parameters of ship
Dead weight. thousand.t Length, м
Width, м Platform depth, м Loaded draft, м
Universal complexes for transshipment
metal СН-40 40,2 185,6 30,6 16,4 11,5
  СН-30 30,6 179,0 27,7 14,1 9,9
  СО-9 9,0 127,4 21,5   7,2
Forest cargo “river-sea” type 5,9 140,0 16,5   4,52
  СЛ-6 6,2 100,60 18,60 8,50 6,30
  СЛ-5 5,0 98,20 17,60 7,80 6,99
Mineral fertilizers “river-sea” type 5,9 140,0 16,5   4,52
  СН-20 19,5 165,50 23,00 13,50 9,90
  СН-50 50,0 206,00 32,20 18,00 11,50

The list of the volume of work according to the general plan is given in Table 14.

Table 14.

Title of works Unit of measurement Quantity
  Dredging total: тыс.м3 33 000
1 Channel up to mineral fertilizers with width,164 м тыс.м3 14 000
2 Complex on the forest transshipment тыс.м3 3 500
3 Complex on the forest transshipment and its processing тыс.м3 3 000
4 Complex on the metal transshipment тыс.м3 7 500
5 Complex on the transshipment of mineral fertilizers тыс.м3 5 000
  Forming of the territory total тыс.м3 10 450
1 Complex of mineral fertilizers тыс.м3 2 900
2 Complex on the forest transshipment тыс.м3 3 900
3 Complex on the forest transshipment and its processing тыс.м3 550
4 Complex on the metal transshipment тыс.м3 3 100

The surplus of ground is packed to the alluvial maps, for forming of reserve territory and stabilization of ground.
The list of the requirement for the available water resources of the objects of the second stage is given in Table 15.

Table 15.

Title of works Unit of measurement Quantity Nota bene
1 Water area, total ga 184,2  
  including:      
  Complex on the forest transshipment (-9,6м) ga 45,3 Сущ. отметка акватории - минус 2,8 м
  Complex on the forest transshipment and its processing (-9,6м) ga 32,1 Сущ. отметка акватории - минус1,3 м
  Complex on the metal transshipment (-14,10м) ga 63,2 Сущ. отметка акватории - минус 3,3 м
  Complex on the transshipment of mineral fertilizers (-14,10м) ga 43,6 Сущ. отметка акватории- минус 4 м
2 Channel up to mineral fertilizers with width 164м m 12 600 Сущ. отметка акватории - минус 14,4 м-3,3 м

Complex for the transshipment of metal

The construction will consist of the following basic objects:
- sea cargo front consisting of 4 moorages, including: 1 moorage for access of ships "river- sea" type, delivering the part of the cargo turn-over for further export of metal;
- railroad cargo front - intraport railway lines;
- open storage area;
- the covered storehouse;
- the quay track and back crane runways;
- the engineering shifting equipment;
- engineering objects and the communication
- the interarea motor roads;
- platforms for settling of equipment;
- administration building;
- Checkpoint complex
It is planned to use cross gantry of g/p 10-40 t or balance crane, universal diesel trucks and marine tractors with trailers for loading-unloading of cargo.
Delivery and pickup of metal of the open and covered storage into the port will be by rail, water and motor transport.

5.2. Complex for the transshipment of forest cargo

The construction will consist of the following basic objects:

- sea cargo front consisting of 5 moorages for access of ships "river- sea" type, delivering the part of the cargo turn-over for further export of forest;
- railroad cargo front - intraport railway lines;
- open storage area;
Quay track and rear craneways
Engineering transshipment equipment;
Engineering objects and communications;
- the interarea motor roads;
Platforms for settings of equipment
Administrative building;
Checkpoint complex
It is planned to use cross gantry of g/p 10-16 t or balance crane, universal diesel trucks and marine tractors with trailers for loading-unloading of cargo.
Delivery and pickup of metal of the open and covered storage into the port will be by rail, water and motor transport.

Complex of mineral fertilizers

The complex will consist of the following basic objects:
- railroad cargo front including the station of unloading railroad cars and dead end spur;
- sea cargo front, including one moorage and coast mechanization for the loading of ships;
- covered storehouse;
- transport conveyor system including conveyor galleries, elevated roads, shifting , power-drive and tension stations;
- central control board;
- laboratory for the quality control of the mineral fertilizers.

The transportation conveyor system provides the following options for mineral fertilizer transshipment:
- Wagon- vessel
- Wagon – warehouse
- Warehouse -vessel
- Warehouse- warehouse (cross transshipment)
- Warehouse -vessel + Wagon- vessel (mixed option).
For the system maintenance we plan to install workshops, administration building, power facilities, utility systems and supply lines.

5/4, Putevaya Str., Krasnodar, 350015, Russia.
Tel./Fax: +7(861) 255-60-31 .
E -mail: tamanseaport@yandex.ru